Engineering building
Pictures taken Jan 5, 2006; four months after the storm.
We still have to wear masks in this building.
Columns outside the EN building
EN building first floor hallway
EN building first floor network closet
EN building first floor hallway
UPS is hosed.
 
That switch just to the left of the door was 4 feet up and not to worry, that powder is just dead mold.
 
Even though equipment was out of the water, it still had plenty of mold on it.
 
EN building first floor auditorium. This is/was a projector screen.
EN building first floor auditorium.
 
EN building basement. It still has about 6" of liquid 4 months after the storm.
There is no power in the building yet.
 
Pictures from UNO
Miscelaneous buildings after the storm.
Power is returning to UNO's main campus.
Engineering building and its basement.
Science building basement.
Lafitte Village flooding Founders Road
Back on track at the Jefferson Center on Causeway Blvd.
Clearing out a network closet in preparation for remediation.
Presidents Bush and Clinton visited UNO Dec 7, 2005.
(Their Katrina Fund)
Back to the main Katrina map page.